Worcester Sewer Rehabilitation
Worcester, MA

Owner: City of Worcester
General Contractor: GVC Construction, Inc.

Trench excavation and backfill, installed 8-inch to 30-inch PVC pipe, replaced manholes. Catch basins connections, sewer point repairs.