CMOM Phase II Sewer Rehabilitation Repair Projects
Manchester, NH

Owner: City of Manchester, NH Environment Protection Division
General Contractor: Green Mountain Pipeline Services

General Contractor GMPS installed +22,000 LF of sewer rehabilitation using (CIPP) cured-in-place pipe lining on existing 8-inch to 42-inch diameter sewer pipes.. GVC Construction installed approximately +2,500 LF of manhole sewer replacements of 8-inch to 24-inch diameter sewer pipes.

We excavated point repairs to approximately 150 LF of sewer pipe, ranging in diameter for 8-inches to 15-inches, including +60 sewer manhole replacements. GVC Construction performed emergency repairs of 18” Sewer under Wellington Road pipe jacking 180 LF of 48” of steel casing, including sewer bypass and full restoration of wetlands.